Preparing Raw Land for Commercial or Mixed-Use Projects

What This Page Covers

A straightforward process to take raw land from concept to build-ready for retail, office, hospitality, industrial, or mixed-use. Use this as a checklist for due diligence, approvals, site design, utilities, access, budgeting, and phasing.

Quick Checklist (Copy/Paste)


  • Verify zoning, future land use map, and overlays

  • Confirm allowable uses, density/FAR, and height limits

  • Order ALTA/NSPS survey and title commitment with exceptions

  • Run environmental screens (Phase I ESA), wetlands/floodplain checks

  • Check utilities: water, sewer/septic, power, gas, telecom; capacity letters

  • Traffic/access: driveway permits, turn lanes, sight distance

  • Geotech/soils, topography, and drainage modeling

  • Concept site plan + test fits for parking, loading, fire lanes

  • Entitlements: rezones, conditional/special uses, variances, PUD/MXD

  • Off-site improvements and impact fees

  • Budget: hard/soft costs, pro forma, lender package

  • Schedule: entitlement timeline, permit path, bid/award, mobilization

Step-by-Step Process

Raw Land For Commercial Use

Buck Horn Mesa 15-B | 5 Acres Buck Horn Mesa 15-B | 5 Acres
Quick View
Buck Horn Mesa 12-J | 5 Acres Buck Horn Mesa 12-J | 5 Acres
Quick View
2297-5-5 | 10 Acres 2297-5-5 | 10 Acres
Quick View
2297-5-5 | 10 Acres
$84,900.00
4532-0235 | 5 Acres 4532-0235 | 5 Acres
Sale
Quick View
4532-0235 | 5 Acres
Sale Price: $69,900.00 Original Price: $79,900.00
Buck Horn Mesa 19-I Buck Horn Mesa 19-I
Quick View
Buck Horn Mesa 19-I
$69,900.00
Buck Horn Mesa 12-H | 5 Acres
Quick View

Deliverables You’ll Need

  • ALTA/NSPS survey + legal description

  • Title commitment with exception documents

  • Phase I ESA + any follow-ups

  • Geotech report + pavement design

  • Topographic base map and constraints map

  • Concept/test-fit site plans and renderings

  • Utility capacity/will-serve letters

  • Traffic scoping/TIS and access permits

  • Stormwater report and civil plan set

  • Entitlement approvals and conditions matrix

  • Detailed budget, schedule, and pro forma

Timeline Snapshot (Typical Range)

Pre-app & feasibility: 2–6 weeks

Studies & concept plan: 4–10 weeks

Entitlements/approvals: 2–6+ months (jurisdiction-dependent)

Civil/Building permits: 1–4 months (can overlap)

Common FAQ’s

  • Not always. Some districts allow mixed-use by right; others require a PUD/MXD or conditional use. Check both zoning text and comp plan.

  • Start with feasibility and concept, then seek LOIs to support entitlements and financing. Full leases often finalize after approvals.

  • Request written capacity/will-serve letters from each utility. Plan for off-site upgrades if capacity is limited.

  • Jurisdictions set trip thresholds. Mixed-use can benefit from internal capture; confirm scope with the reviewer early.

  • Yes. Phase by pad or building. Align off-site improvements and utility loops so each phase can stand alone.

Why Choose Us for Raw-Land Prep


  • Entitlement Navigation: We map approvals from pre-app through final permits.

  • Site-First Design: Test fits that protect circulation, fire access, and future phases.

  • Real Budgets: Clear hard/soft costs, off-site work, and contingency planning.

  • Local Coordination: Direct utility, DOT, and city/county coordination to keep schedules moving.

Reviews From Buyers

  • If you want a piece of heaven then this company is a good start. We got our lot so that we can get away and just be a family.

    ★★★★★

    James M.

  • The loan terms make it affordable to own a piece of land. We are looking forward to start building and moving on to the property as soon as possible

    ★★★★★
    Stephanie E.

  • This is such an amazing team to work with! Hands down the easiest way to buy land. They really listen and took care of our family!

    ★★★★★

    Megan W