Building a Barn or Shed: Permits and Prep

Thinking of adding a barn, shed, or outbuilding to your Utah land? Whether you're planning for livestock, tools, or a weekend workshop, prepping properly can save you time, money, and headaches down the line. Here's what you need to know before getting started—especially in places like Duchesne County.

Understand Duchesne County Permit Basics

Before you break ground, check in with the Duchesne County Planning Department. A few key things to note:

  • Structures over 200 square feet typically require a permit

  • You’ll need a site plan showing placement, access roads, and distance from property lines

  • Electrical or plumbing installations require additional permits

  • Some subdivisions may have their own HOA restrictions or architectural guidelines

Pro Tip: Even if your structure doesn’t need a permit, it still must follow zoning and setback rules.

Prep Your Site: Foundation, Access & Placement

Building on raw land? A little prep goes a long way:

  • Foundation: Choose a foundation suited to your use—gravel pad, concrete slab, or pier blocks. Consider water flow and drainage.

  • Access: Ensure year-round access. That might mean grading a driveway or checking your route against county easements.

  • Placement: Avoid flood zones, low areas, and steep grades. Position your building for sun exposure and future expansion.

Planning for power later? Place your shed or barn within reach of utilities or solar-friendly zones.

Common Uses: What’s Your End Goal?

Not all barns and sheds serve the same purpose. Think ahead:

Storage

Great for tractors, trailers, firewood, and tools. Add shelving, lockable doors, or open lean-to space.

Livestock

Plan for stalls, fencing, water access, and ventilation. You might need additional permits if animals are involved.

Workshop

Want a quiet place to tinker or build? Consider insulation, power sources, and workspace layout.

Multipurpose

Combo spaces—like storage + guest lofts or shop + carport—are popular on larger properties.

FAQs About Building on Rural Utah Land

Do I need a building permit for a shed in Duchesne County?
Yes—if it’s over 200 sq ft or includes utilities. Always check with the county first.

Can I live in a barn or shed temporarily?
Not usually. Sleeping quarters require special approval and may trigger residential zoning requirements.

What foundation should I use?
It depends on your budget and building type. For most sheds, a gravel pad or concrete slab is sufficient.

Will my land be accessible during winter?
Plan ahead for snow plowing or seasonal access challenges—especially if your site sits in higher elevations.

Browse Land Ready for Barns, Sheds, or Shops

If you're dreaming of an off-grid shop, a homestead with a livestock barn, or just a quiet tool shed in the hills, we’ve got parcels that fit the bill. Many of our properties already offer graded access, A-5 zoning, and open placement flexibility.

👉 Browse available properties now

Next
Next

5 Creative ways to make your land feel like home without building